RAMS Template
Main contractors want a RAMS before you set foot on site. Pick your trade and tasks, add the site details, and get a complete Risk Assessment and Method Statement written for the job.
- ✓Written for your trade and the tasks on this job
- ✓Sequence of works, plant, permits and PPE
- ✓Emergency arrangements and sign-off sheet
- ✓Duplicate it for the next job in seconds (Pro)
In short
A RAMS (risk assessment and method statement) is a combined document that identifies the hazards of a specific job, the controls that reduce the risk, and the step-by-step safe method of work. UK law requires a suitable and sufficient risk assessment; main contractors usually require a RAMS before you start on site.
What it must include
- ✓Scope of works, site address, dates and who is involved
- ✓Hazards, who could be harmed and how
- ✓Control measures and the risk rating before and after
- ✓Sequence of works from preparation to completion
- ✓Plant, tools, permits and PPE
- ✓Competence, supervision and emergency arrangements
- ✓Briefing and sign-off by the people doing the work
£15 per document or £29/month unlimited with Pro. Free preview first, no card needed.
You stay the duty holder: review the document for your site before work starts. SitePaper is a drafting tool, not a consultancy.