RAMS template for tree surgeons
Tree-surgery RAMS should be based on a site and tree inspection and define the sequence for access, cutting, rigging, lowering, chipping and clearance. Falls, tree or branch failure, chainsaws, suspended loads, wood chippers, traffic, public intrusion and overhead lines can be fatal. The Work at Height Regulations 2005 require properly planned work by competent people, while PUWER and LOLER apply to machinery and lifting equipment. Arborists need task-specific training and competence for chainsaws, climbing, rigging and aerial rescue, with relevant certificates commonly used as evidence. Establish a robust drop-zone and communication system, confirm utility clearances, keep a rescue climber and equipment ready, and stop when wind, decay or loading differs from the plan.
- ✓Typical tree surgeon tasks: Use of portable power tools, Lifting operation with mechanical lifting equipment, Temporary workplace traffic management, Mobile elevating work platform operation
- ✓Sequence of works, plant, permits and PPE
- ✓Editable Word and print-ready PDF
In short
A RAMS (risk assessment and method statement) is a combined document that identifies the hazards of a specific job, the controls that reduce the risk, and the step-by-step safe method of work. UK law requires a suitable and sufficient risk assessment; main contractors usually require a RAMS before you start on site.
What it must include
- ✓Scope of works, site address, dates and who is involved
- ✓Hazards, who could be harmed and how
- ✓Control measures and the risk rating before and after
- ✓Sequence of works from preparation to completion
- ✓Plant, tools, permits and PPE
- ✓Competence, supervision and emergency arrangements
- ✓Briefing and sign-off by the people doing the work
You stay the duty holder: review the document for your site before work starts. SitePaper is a drafting tool, not a consultancy.