Air-source heat pump installation and commissioning Method Statement

A method statement for air-source heat pump installation and commissioning, laid out step by step and paired with a scored risk assessment.

In short

A method statement sets out how a task will be carried out safely, step by step: preparation, set-up, the work itself and completion, with the plant, permits, competence and supervision needed. It puts the controls identified in the risk assessment into a safe system of work.

What it must include

  • Task description, location and duration
  • Step-by-step sequence of works
  • Plant, equipment and materials
  • Permits and isolations required
  • Competence, training and supervision
  • PPE and emergency arrangements
£15 a document · £39/month unlimited with ProFree preview first, no card needed.

You stay the duty holder: review the document for your site before work starts. SitePaper is a drafting tool, not a consultancy.

Create yours now

Free preview in about a minute. No card needed.

01

The job

Pick your trade and tick what the job involves.

Tasks on this job

Choose your trade to see its usual tasks first.

02

Your details

03

The work

04

Emergency arrangements

Leave blank and the document reminds you to confirm them on site.

Free preview. £15 to download, or unlimited with Pro at £39/month. To tidy the wording, the work description, document type, trade, duration and hazard titles are sent to our AI provider, Anthropic; your company, address and names in the other fields are not.

Sources

Page updated 2026-10-04.

Related

Use of ladders and stepladdersMobile elevating work platform operationMobile scaffold tower useRoof access and roof workHot workConfined-space recognition and no-entry awarenessExcavation and trench workManual handling of materialsLifting operation with mechanical lifting equipmentCutting and grindingUse of portable power toolsSafe electrical isolation