Method statement for mobile scaffold towers

A mobile tower method statement should state the tower system, platform height, assembly method and permitted location. It needs controls for competent erection, manufacturer instructions, guardrails, toe boards, internal access, stabilisers, locking castors and formal inspection. Falls during assembly, tower overturn, falling tools and contact with openings or overhead services are foreseeable hazards. Under the Work at Height Regulations 2005, the work and access equipment must be planned, suitable and inspected by competent people. Use the recognised through-the-trapdoor or advance-guardrail build method for the selected system. Before anyone climbs, check that the tower is level, all components are fitted, the inspection tag is current and the exclusion area remains effective.

In short

A method statement sets out how a task will be carried out safely, step by step: preparation, set-up, the work itself and completion, with the plant, permits, competence and supervision needed. It puts the controls identified in the risk assessment into a safe system of work.

What it must include

  • ✓Task description, location and duration
  • ✓Step-by-step sequence of works
  • ✓Plant, equipment and materials
  • ✓Permits and isolations required
  • ✓Competence, training and supervision
  • ✓PPE and emergency arrangements
£15 per document or £29/month unlimited with Pro. Free preview first, no card needed.

You stay the duty holder: review the document for your site before work starts. SitePaper is a drafting tool, not a consultancy.

Create yours now

Free preview in about a minute. No card needed.

1

The job

Pick your trade and tick what the job involves.

Tasks on this job

Choose your trade to see its usual tasks first.

2

Your details

3

The work

4

Emergency arrangements

Leave blank and the document reminds you to confirm them on site.

Free preview. £15 to download, or unlimited with Pro at £29/month. Only the work description box is sent to our AI provider, Anthropic, to tidy the wording; the other fields are not.

Questions

Does a tower assembler need training?

They must be competent to assemble and inspect that system; recognised tower training is a common way to demonstrate competence.

Can a mobile tower be moved with someone on it?

No. Descend first, remove loose materials, check the route and overhead hazards, then push at the base as instructed by the manufacturer.

How often is a tower inspected?

Inspect after assembly, after events that could affect safety and at legally required intervals where the platform conditions trigger recorded inspections.

Sources

Page updated 2026-10-04.

Related

Use of ladders and stepladdersMobile elevating work platform operationRoof access and roof workHot workConfined-space recognition and no-entry awarenessExcavation and trench workManual handling of materialsLifting operation with mechanical lifting equipmentCutting and grindingUse of portable power toolsSafe electrical isolationWorking near buried or overhead services