Method statement for mobile elevating work platforms
A MEWP method statement must identify the machine, planned route, working height and load, then set controls for delivery, positioning, operation and recovery. Common hazards include overturning on weak ground, trapping against structures, falls, dropped materials, traffic and overhead power lines. The Work at Height Regulations 2005 are central, while PUWER and LOLER also affect equipment suitability, maintenance and lifting examinations. Operators must be trained and competent, and the chosen MEWP must suit the task and environment. Before starting, confirm ground-bearing capacity and overhead clearances in person; a rescue plan with someone able to use the ground controls is essential, not an instruction simply to call emergency services.
- ✓5 steps from preparation to completion
- ✓Covers: 3 key hazards and their controls
- ✓Permits: work-at-height permit or site authorisation where required
In short
A method statement sets out how a task will be carried out safely, step by step: preparation, set-up, the work itself and completion, with the plant, permits, competence and supervision needed. It puts the controls identified in the risk assessment into a safe system of work.
What it must include
- ✓Task description, location and duration
- ✓Step-by-step sequence of works
- ✓Plant, equipment and materials
- ✓Permits and isolations required
- ✓Competence, training and supervision
- ✓PPE and emergency arrangements
You stay the duty holder: review the document for your site before work starts. SitePaper is a drafting tool, not a consultancy.