Method Statement
Example Decorating Ltd
| Site | Unit 3, Riverside Business Park, Leeds |
| Client | Riverside Estates |
| Start | 2 November 2026 |
| Duration | 4 days |
| Prepared by | J. Smith |
| Date | 1 October 2026 |
1. Scope of works
Repaint the high-level walls and ceiling of an empty warehouse unit using a mobile scaffold tower.
People on site / affected: 2 decorators; site manager on site daily
2. Risk assessment
Risk rating = likelihood (1-5) x severity (1-5). 1-4 Low, 5-12 Medium, 15-25 High.
| Hazard | Who / harm | Before | Control measures | After |
|---|---|---|---|---|
| Unsafe storage of combustible materials | workers, occupants, public Rapid fire spread, smoke inhalation or blocked escape. | 20 High |
| 10 Medium |
| Fall from scaffold tower | tower users Serious injury or fatality. | 20 High |
| 5 Medium |
| Scaffold tower collapse or overturn | tower users, people nearby Crushing, fall injuries or fatality. | 20 High |
| 5 Medium |
| Falling tools or materials | operatives, other workers, public Head injury, crushing or fatality to people below. | 20 High |
| 10 Medium |
| High wind affecting height or lifting work | workers at height, lifting team, public Falls, overturn, uncontrolled loads or falling objects. | 20 High |
| 5 Medium |
| Solvent and VOC vapour exposure | users, occupants, nearby workers Dizziness, irritation, dermatitis, unconsciousness or long-term ill health. | 16 High |
| 8 Medium |
| Lead dust or fume | workers disturbing lead, others exposed to contamination Lead poisoning affecting nervous, blood, kidney and reproductive systems. | 16 High |
| 8 Medium |
| Stepladder collapse or overturn | operatives, others nearby Fracture, head injury or fatal fall. | 16 High |
| 8 Medium |
| Blocked or unavailable fire escape | workers, occupants, visitors Entrapment, smoke inhalation or fatality during evacuation. | 15 High |
| 5 Medium |
| Trip over cables, waste or uneven ground | workers, visitors, public Sprain, fracture or impact injury. | 12 Medium |
| 3 Low |
3. Method statement: sequence of works
Preparation
- Identify coating/substrate hazards including lead, select lower-hazard products and plan ventilation and access.
- Select a tower configuration suitable for height, load, access and manufacturer limits.
Set-up
- Protect and segregate the area, remove ignition sources, establish ventilation and position safe access equipment.
- A trained person shall assemble on firm level ground using the instruction manual and approved safe method.
- Fit guardrails, toe boards, internal access, stabilisers and ballast; lock castors and inspect before use.
Carrying out the work
- Keep containers closed, use minimum quantities and maintain ventilation without blocking escape routes.
- Stop for unexpected suspect coating, symptoms or inadequate ventilation.
- Keep trapdoors closed, loads within limits and users inside guardrails; stop in excessive wind.
Completion
- Seal and store products, dispose of contaminated waste safely, remove coverings and ventilate until safe for reoccupation.
- Clear the platform and have trained persons dismantle in the approved sequence, then quarantine defects.
PPE
- safety helmet
- safety footwear
- weather-appropriate clothing
- chemical-resistant gloves selected from SDS
- eye protection
- RPE only where assessed and face-fit tested
- suitable face-fit-tested RPE
- disposable or dedicated clothing
Plant and tools
- brushes and rollers
- suitable access equipment
- local ventilation where assessed
- sealed waste containers
- compatible tower components
- stabilisers
- barriers
- manufacturer instruction manual
- steps
- tower scaffold
- sander with extraction
- sprayer where assessed
Permits
- occupancy or out-of-hours authorisation where required
- scaffold handover or tower inspection record where site rules require
Competence and supervision
- Operatives must understand product COSHH assessment and access equipment; lead disturbance requires a specific assessment and controls.
- Assembler must be trained in the selected tower system and safe assembly method; users must receive instruction.
Emergency arrangements
- Move affected people to fresh air, follow SDS first aid, raise the fire alarm for ignition and obtain medical help for significant exposure.
- Prevent further access, call site rescue/first aid after a fall, and do not move an unstable tower until the area below is cleared and a competent person directs it.
- Appointed first aider / person: J. Smith (supervisor).
- Nearest A&E: Leeds General Infirmary.
- In an emergency call 999. Report incidents to the site manager and record them; reportable incidents must be notified under RIDDOR 2013.
Check on site before work starts
- Confirm quantities, flash points and fire compartment/escape routes.
- Confirm platform height and inspection status.
- Confirm tower make, configuration, height-to-base limits and wind exposure.
- Confirm exclusion-zone boundary and public interface.
- Confirm local gust limit and safe shutdown method.
- Confirm SDS, exposure limit, ventilation and flammability.
- Confirm survey/testing, exposure significance and medical-surveillance decision.
- Confirm manufacturer markings and maximum standing level.
- Confirm current fire risk assessment and temporary route changes.
- Confirm cable routes, floor defects and shared access.
Legislation and guidance referred to
Control of Lead at Work Regulations 2002; Control of Substances Hazardous to Health Regulations 2002; Dangerous Substances and Explosive Atmospheres Regulations 2002; HSE CIS10; HSE INDG225; HSE INDG305; HSE INDG455; LOLER 1998; Regulatory Reform (Fire Safety) Order 2005; Work at Height Regulations 2005; Workplace (Health, Safety and Welfare) Regulations 1992
Briefing and sign-off
I confirm this document has been explained to me and I understand the controls.
| Name | Signature | Date |
|---|---|---|
This document was drafted with SitePaper from information supplied by Example Decorating Ltd. The employer / contractor remains responsible for its contents and must have it reviewed by a competent person for the specific site and task before work starts. Contains public sector information licensed under the Open Government Licence v3.0.