Method statement for first-fix carpentry

A first-fix carpentry method statement should cover setting out, timber delivery, cutting, framing, fixing and temporary support. Circular and mitre saws, nail guns, wood dust, manual handling, falls between joists and collapse of incomplete framing are key hazards. PUWER 1998 requires machinery and tools to be suitable, guarded, maintained and used by trained people. Specify extraction suitable for wood dust, push sticks and supports for cutting, and the safe system for nail-gun use. Brace frames and trusses in the sequence required by the designer or manufacturer, and do not rely on unfinished work for access. Cap protruding fixings, protect floor openings, store timber flat and segregate the cutting area from other trades.

In short

A method statement sets out how a task will be carried out safely, step by step: preparation, set-up, the work itself and completion, with the plant, permits, competence and supervision needed. It puts the controls identified in the risk assessment into a safe system of work.

What it must include

  • ✓Task description, location and duration
  • ✓Step-by-step sequence of works
  • ✓Plant, equipment and materials
  • ✓Permits and isolations required
  • ✓Competence, training and supervision
  • ✓PPE and emergency arrangements
£15 per document or £29/month unlimited with Pro. Free preview first, no card needed.

You stay the duty holder: review the document for your site before work starts. SitePaper is a drafting tool, not a consultancy.

Create yours now

Free preview in about a minute. No card needed.

1

The job

Pick your trade and tick what the job involves.

Tasks on this job

Choose your trade to see its usual tasks first.

2

Your details

3

The work

4

Emergency arrangements

Leave blank and the document reminds you to confirm them on site.

Free preview. £15 to download, or unlimited with Pro at £29/month. Only the work description box is sent to our AI provider, Anthropic, to tidy the wording; the other fields are not.

Questions

Can a circular-saw guard be wedged open?

No. Guards and riving arrangements must function as designed; stop and replace or repair defective equipment.

Is wood dust hazardous?

Yes. Hardwood dust can cause cancer and both hardwood and softwood dust can cause asthma, requiring effective control.

Who decides temporary bracing?

Follow the structural designer, truss or frame manufacturer and erection plan; changes need competent approval.

Sources

Page updated 2026-10-04.

Related

Use of ladders and stepladdersMobile elevating work platform operationMobile scaffold tower useRoof access and roof workHot workConfined-space recognition and no-entry awarenessExcavation and trench workManual handling of materialsLifting operation with mechanical lifting equipmentCutting and grindingUse of portable power toolsSafe electrical isolation