Method statement for work near buried or overhead services
This method statement should identify electricity, gas, water, telecoms and other services that could be affected by digging, lifting or work at height. Striking buried cables or pipes can cause electrocution, fire, explosion and flooding, while plant approaching overhead lines can arc without contact. CDM 2015 requires underground services to be located and suitable steps taken to prevent risk; HSE guidance HSG47 provides the practical planning framework. Obtain and review current plans, survey the site with appropriate locating equipment, mark routes and use safe digging techniques. For overhead lines, consult the network operator and establish goalposts and clearances. Stop work whenever the location, depth or identity of a service is uncertain.
- ✓5 steps from preparation to completion
- ✓Covers: 3 key hazards and their controls
- ✓Permits: permit to dig, overhead-line crossing authorisation where required
In short
A method statement sets out how a task will be carried out safely, step by step: preparation, set-up, the work itself and completion, with the plant, permits, competence and supervision needed. It puts the controls identified in the risk assessment into a safe system of work.
What it must include
- ✓Task description, location and duration
- ✓Step-by-step sequence of works
- ✓Plant, equipment and materials
- ✓Permits and isolations required
- ✓Competence, training and supervision
- ✓PPE and emergency arrangements
You stay the duty holder: review the document for your site before work starts. SitePaper is a drafting tool, not a consultancy.