Method statement for solar PV installation

A solar PV installation method statement should follow the system design from delivery and roof access through mounting, DC cabling, inverter connection, testing and handover. Falls, fragile roofs, wind-loaded panels, manual handling, dropped objects and live DC generation in daylight are critical hazards. The Work at Height Regulations 2005 and Electricity at Work Regulations 1989 require competent planning and electrical precautions. Roofing and electrical work must be undertaken by people competent for their roles, with any certification scheme or building-control requirements confirmed for the project. Use collective edge protection and surveyed anchor arrangements, control panel lifting against wind, keep connectors protected, and apply the manufacturer’s shutdown and test sequence; covering a module is not automatically a reliable electrical isolation.

In short

A method statement sets out how a task will be carried out safely, step by step: preparation, set-up, the work itself and completion, with the plant, permits, competence and supervision needed. It puts the controls identified in the risk assessment into a safe system of work.

What it must include

  • ✓Task description, location and duration
  • ✓Step-by-step sequence of works
  • ✓Plant, equipment and materials
  • ✓Permits and isolations required
  • ✓Competence, training and supervision
  • ✓PPE and emergency arrangements
£15 per document or £29/month unlimited with Pro. Free preview first, no card needed.

You stay the duty holder: review the document for your site before work starts. SitePaper is a drafting tool, not a consultancy.

Create yours now

Free preview in about a minute. No card needed.

1

The job

Pick your trade and tick what the job involves.

Tasks on this job

Choose your trade to see its usual tasks first.

2

Your details

3

The work

4

Emergency arrangements

Leave blank and the document reminds you to confirm them on site.

Free preview. £15 to download, or unlimited with Pro at £29/month. Only the work description box is sent to our AI provider, Anthropic, to tidy the wording; the other fields are not.

Questions

Can PV panels be made dead in daylight?

Modules generate DC when illuminated. Competent installers must follow the system design and manufacturer’s isolation, connection and test procedure.

Who may connect the PV electrical system?

A person competent for PV DC and AC work, testing and the applicable wiring, notification and certification requirements.

How should panels reach the roof?

Use a planned mechanical or controlled lifting method that considers weight, size, wind, edge protection and the landing area.

Sources

Page updated 2026-10-04.

Related

Use of ladders and stepladdersMobile elevating work platform operationMobile scaffold tower useRoof access and roof workHot workConfined-space recognition and no-entry awarenessExcavation and trench workManual handling of materialsLifting operation with mechanical lifting equipmentCutting and grindingUse of portable power toolsSafe electrical isolation